Mega Street Bridge
- Estimated date of completion: November 2012
Located on the north side of the North Academic Building
- Cost: 1.2 million dollars
Students parking in the Mega/Frank lot will be able to access the bridge through a tower with a stairwell and elevator. They will be able to safely cross over Mega Street inside the bridge and enter into the second floor of the North Academic building.





